Manual Concrete Placing Boom
Booms/Arms: 2 jib
Length of Booms: 10m, 13m or customization
Total weight: 800 ~ 1000 kg
- Quality assurance
- Fast delivery
Description
POIN Manual concrete placing boom is ideal for projects of high rise buildings, bridges and dams. Installed on the slewing supporting holder, the main beam frame can rotate 360°. Pipe supports on the front beam are used to fix and support delivery pipelines. The balancing frame on the rear beam is installed to achieve the balance.
Product Description
POIN is a professional manufacturer of concrete machinery and excavator attachments and accessories, with more than 20 years of production experience. POIN HG series concrete placing boom are designed from Putzmeister technology, through continuous upgrading and improvement, achieved perfect performance already.
POIN Manual placing boom includes supporting steel pipes, pipe supports, pull bars, a beam, etc.
Installed on the slewing supporting holder, the main beam frame can rotate 360°. Pipe supports on the front beam are used to fix and support delivery pipelines. The balancing frame on the rear beam is installed to achieve the balance.The Manual Concrete Placing Boom series is structurally stable and reliable, operationally portable and flexible.
Advantages
Efficient, economical and easy to operate
1. Two arms design, manual operation and 360° rotation.;
2. Reduce the labor intensity and improve the construction quality.;
3. The machine can be conveniently moved to different sites owing to its small volume and light weight, and no needs concrete foundation.
Manual Placing Boom Parameters
| Model | HGM10 | HGM13 | |
| Performance | Max. Radius of Placing Boom(m) | 10 | 13 |
| Free Placing Height (m) | 0.6 | 0.6 | |
| slewing range( º ) | 360° | 360° | |
| working temperature(℃) | 0〜60 | 0〜60 | |
| Total Weight(kg) | 1400 | 1650 | |
| Counter Weight(kg) | 800 | 1000 | |
| Max. Height(mm) | 1760 | 2100 | |
| Max.Working Width (mm) | 3153 | 3400 | |
| Hydraulic System | System Pressure (Mpa) | ||
| Flow(L/min) | |||
| Oil Tank capacity(L) | |||
| Arm | Boom Mode | Manual | Manual |
| Delivery Pipeline Diameter | DN125mm | DN125mm | |
| Length of End Hose(″× m) | 5″×3 (selected) | 5″×3 (selected) | |
| Transportation | The shipping container | 20GP =3~5 units | 20GP =3~5 units |
| Trans. L*W*H (mm) | 5600*1030*1760 | 6800*1030*2100 |
Application
The Manual placing booms are suitable for those situations in which the work of fixed placing boom and pumps are limited, such as:
1. When the concrete pump cannot completely place concrete on the large areas or construction sites.
2. When use hydraulic climbing placing boom takes too much time and energy to place concrete for the floor and columns.
3. For the project of production the precast units in a specially requested design.





















Reviews
There are no reviews yet.